Hydrometallurgy: Leaching in Heap, Vat, CIL, CIP, Merrill–Crowe, SX Solvent Extraction

Hydrometallurgy: Leaching in Heap, Vat, CIL, CIP, Merrill–Crowe, SX Solvent Extraction

  • To participate in the 911Metallurgist Forums, be sure to JOINLOGIN
  • Use Add New Topic to ask a New Question/Discussion about Hydrometallurgy.
  • OR Select a Topic that Interests you.
  • Use Add Reply = to Reply/Participate in a Topic/Discussion (most frequent).
    Using Add Reply allows you to Attach Images or PDF files and provide a more complete input.
  • Use Add Comment = to comment on someone else’s Reply in an already active Topic/Discussion.

SART circuit location in gold processing plant (2 replies and 1 comment)

B
WTandC
3 years ago
WTandC 3 years ago

In a review of an existing gold operation the PFD shows their SART circuit after the CIP and cyanide thickening circuits. As CNCu complexes are an issue can the SART circuit be placed after the leach circuit and before the CIP circuit?

d
David
3 years ago
David 3 years ago

not sure I understand, place the SART before the CIP? As SART is normally for a solution, not pulp. It could be a rather busy flowsheet.

B
WTandC
3 years ago
WTandC 3 years ago

Thanks David. I had assumed the output from the leach circuit was a solution in order to reduce introducing solids to the CIP circuit.

Mike
3 years ago

CIP = carbon in PULP