Hydrometallurgy: Leaching in Heap, Vat, CIL, CIP, Merrill–Crowe, SX Solvent Extraction

Hydrometallurgy: Leaching in Heap, Vat, CIL, CIP, Merrill–Crowe, SX Solvent Extraction

  • To participate in the 911Metallurgist Forums, be sure to JOINLOGIN
  • Use Add New Topic to ask a New Question/Discussion about Hydrometallurgy.
  • OR Select a Topic that Interests you.
  • Use Add Reply = to Reply/Participate in a Topic/Discussion (most frequent).
    Using Add Reply allows you to Attach Images or PDF files and provide a more complete input.
  • Use Add Comment = to comment on someone else’s Reply in an already active Topic/Discussion.

High Lime Consumption in CIL circuit (No replies)

A
Ali Rahim
6 months ago
Ali Rahim 6 months ago

Hi everyone, 

I work in a gold mine and recently, we have started to add a new ore into our blend. As indicated in the testwork, this new ore lime demand is 15% higher than our usual ore blend. Our CIL circuit parameters are - 9.8pH, 250ppm (leach tank 1) and 100ppm (tails). To achieve 9.8pH, now we are adding more lime 15% more.

I checked the head assay of this new ore and one thing I found is very elevated level of Mg.

I was wondering if there is any way to reduce the lime consumption? 