Laboratory Testing & General Mineral Processing Engineering

Laboratory Testing & General Mineral Processing Engineering

  • To participate in the 911Metallurgist Forums, be sure to JOINLOGIN
  • Use Add New Topic to ask a New Question/Discussion about Mineral Processing or Laboratory Work.
  • OR Select a Topic that Interests you.
  • Use Add Reply = to Reply/Participate in a Topic/Discussion (most frequent).
    Using Add Reply allows you to Attach Images or PDF files and provide a more complete input.
  • Use Add Comment = to comment on someone else’s Reply in an already active Topic/Discussion.

Design a ball mill for mining process (3 replies and 1 comment)

V
hvyy1612
10 months ago
hvyy1612 10 months ago

Should we choose wet or dry grinding ball mill for 660000 tonnes/year olivine, how to calculate mass balance for the ball mill? What assumptions should be applied to the design of the ball mill to satisfy the requirement that the product size is less than 10 microns. Feed size will be 300 microns.

Mike
10 months ago
Mike 10 months ago

Interesting set of questions, with complicated answers.  First off, what type of processing are you planning, it makes a difference in the wet vs dry portion.  Next, a ball mill would not be the normal choice to go from 300 microns to 10 microns, rather it would be the choice to get to 300 microns.  Normally the way to get to 10 microns would be to take the ball mill product and then use pulverizers to get to the 10 micron range.

V
hvyy1612
10 months ago

Olivine is fed into the ball mill along with water. Feed size olivine is 400 microns and final desired product size from hydrocyclone is 10 microns. Design a process including ball mill and hydrocyclone according to the above requirements and calculate mass balance and energy balance. Are there any percentage passing size from the ball mill? And the percentage of overflow and underflow of the hydrocyclone? 

V
hvyy1612
10 months ago
hvyy1612 10 months ago

This is what I want for my design. 75 ton/hr olivine is fed into the ball mill along with water. Feed size olivine is 300 microns and final desired product size from hydrocyclone is 10 microns. Design a process including ball mill and hydrocyclone according to the above requirements and calculate mass balance and energy balance. Giving that the Bond work index of olivine is 12.38 kwh/tonne. I have attached a pfd that I can refer to for my process. I don't know what assumptions I should put in order to apply to the calculation.

d
David
10 months ago
David 10 months ago