Calculate How Much Energy is Stored in a Flywheel

Slope of Flotation Slurry Launders for Froth Flow

Launders should have high enough velocities to prevent particles from settling, or if they fall to the bottom, to keep them rolling and sliding. The depth of water should not be much over the diameter of the largest rolling particles. For concentrates and heavy gangues slopes should be increased 25—100%. SPRAY WATER IN LAUNDERS:—While it is […]
Troughing Belt Conveyor Capacity

Note. Above capacities are based on the assumption that material will be fed to conveyor uniformly and continuously. If loading is intermittent the conveyor should be designed for the maximum rate of loading likely to occur. For flat belts not troughed, use one-half of the above capacities. https://www.911metallurgist.com/estimating-conveyor-slope-angle
Maximum Conveyor Angle of Inclination

This chart consists of triangles representing horizontal, vertical, and inclined distances. Any one unknown distance can be determined when the other two are known. For distances greater than the limits of the chart, divide the given dimensions by a figure to bring within the range of the chart. Multiply the result by the same figure […]
Estimating Conveyor Slope and Angle

https://www.911metallurgist.com/conveyors-maximum-angle-inclination-various-materials
How much Void in Crushed Materials (Rocks, Sand, Soils)

Slope Angles for Various Bulk Materials in Chutes and Bins

After starting sliding angle is 2°- 3° less. In practice, sliding angles are 5°- 10° more than above. Capacity of chutes is determined largely by the opening to the chute. In gates and other openings or restricted spaces in which pieces of rock are intermittently passing, the width should be at least 3 to 4 […]
What is the Screening Capacity of Vibrating Screen per Area

Average ores carrying up to 10% moisture can be screened to 10 mesh without previous drying: beyond that, the vibratory screening should be wet with 3 to 3.5 ratio of water to ore. Approximate Tons thru screen per square foot screening area per 24 hours, wet or dry. moisture and screen efficiency Screen Capacity of Crushing Plants Screens […]
What is the Settling Rate by Particle Size at Various % Solids Density

Settling Rate by Particle Size
Equivalent Round and Square Screen Openings
